Skip to content

For 2019
P19-V-01 Implementation of Section 2 of the Mine Improvement and New Emergency Response Act of 2006

For 2017
P17-IV-01 Suspended Loads (30 C.F.R. §§ 56/57.16009)


For 2014
P14-V-02 P14-V-02 Technical Citations for Safeguards
P14-V-01 Revised Guidance for Compliance with Post-Accident Two-Way Communication and Electronic Tracking Requirements of the Mine Improvement and New Emergency Response Act of 2006 (MINER Act)
P14-IV-02 Reissue of P12-IV-01 Safety Belts and Lines (30 C.F.R. §§ 56/57.15005)


For 2013
P13-III-01 Reissue of P11-III-1 - Part 41 Legal Identification Numbers for Auger and Highwall Miner Operators and Providing MSHA Notification of the Relocation of These Portable Mining Operations
P13-IV-01 OSHA’s Revised Hazard Communication Standard (HCS) (29 C.F.R. § 1910.1200) as Compliance with MSHA’s Existing Hazard Communication (HazCom) Standard (30 C.F.R. Part 47)
P13-V-02 Reissue of P11-V-05 - Employment Agency Contracting and Part 50 Reporting
P13-V-03 Maintenance of Cutting Bits on Continuous Mining Machines and Longwall Shearers under 30 C.F.R. § 75.1725(a)
P13-V-04 Reissue of P11-V-1; Clarification on Repairs or Maintenance of Machinery, 30 C.F.R. § 75.1725(c)
P13-V-05 Application of Title 30, Code of Federal Regulations (C.F.R.) § 75.523-2 to Mobile Bridge Carriers Connected to Continuous Miners That Form Component Part of Self-Propelled Electric Face Equipment
P13-V-06 Reissue of P11-V-8; Tests for Methane at the Working Face, Using Extendable Probes or Other Acceptable Means
P13-V-07 Reissue of P11-V-04 - Remote Restarting of Conveyor Belts when a Slip Switch Stops the Belt
P13-V-09 Re-Issue of P11-V-07 - Two-Way Communication and Electronic Tracking System: Potential Interference of RF Electromagnetic Fields with Electric Blasting Circuits
P13-V-10 Permits for Mining Under Bodies of Water
P13-V-11 Program for Regular Cleanup and Removal of Accumulations of Coal and Float Coal Dust, Loose Coal, and Other Combustibles
P13-V-12 Examination, Evaluation, and Effectiveness of Bleeder Systems


For 2012
P12-V-01 Reissue of P09-V-08 - Procedures for Revoking MSHA Certifications to Take Respirable Dust Samples or to Maintain and Calibrate Approved Dust Sampling Devices
P12-V-02 Examination, Testing, and Maintenance of Conveyor Belt Emergency Stop Devices under 30 C.F.R. § 77.502
P12-V-03 Reporting of Unplanned Roof Falls in Accordance with 30 C.F.R. § 50.10
P12-V-04 Reissue of P10-V-02 - Requirements of 30 C.F. R. § 75.313 and Two-Way Communication and Electronic Tracking Systems Operation after an Underground Coal Mine Accident
P12-V-05 Reissue of P10-V-6 - Bleeder System Examinations
P12-V-07 Circuit Identification under 30 C.F.R. § 75.903 and 75.904


For 2011
P11-V-10 Approval Plate for Caterpillar Model 3306 PCNA Diesel Engine
P11-V-11 Approval of Communication and Tracking Devices Required by the Mine Improvement and New Emergency Response Act of 2006 (MINER Act)
P11-V-14 Water Sprinkler Fire Protection of Underground Belt Conveyors and Belt Takeup Storage Units
P11-V-15 Interpretation of 30 C.F.R. 75.1100-1 and 2 Regarding Water Delivery Capability of Coal Mine Waterlines when Fighting a Fire with a Firehose and Nozzle
P11-V-16 Suitability, Safety and Performance of Circuit Breakers