Program Policy Manual
VOLUME II - TESTING AND EVALUATION
TABLE OF CONTENTS
INTERPRETATION, APPLICATION AND GUIDELINES ON ENFORCEMENT OF 30 CFR
REFERENCE | CONTENTS |
---|---|
_____________ | _______________________________________________ |
PART 5 | FEES FOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS |
5.30 | Fee Calculation |
PART 18 | ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES |
Subpart A | General Provisions |
18.4 | Electrical Equipment For Which Approval Will Be Issued |
18.6 | Applications |
Subpart B | Construction and Design Requirements |
18.20 | Quality of Material, Workmanship, and Design |
18.22 | Boring-Type Machines Equipped For Auxilliary Face Ventilation |
18.26 | Static Electricity |
18.30 | Windows and Lenses |
18.32 | Fastenings - Additional Requirements |
18.36 | Cables Between Machine Components |
18.37 | Lead Entrances |
18.40 | Cable Clamps and Grips |
18.41 | Plug and Receptacle-Type Connectors |
18.45 | Cable Reels |
18.47 | Voltage Limitation |
18.48 | Circuit-Interrupting Devices |
18.50 | Protection Against External Arcs and Sparks |
18.51 | Electrical Protection of Circuits and Equipment |
18.52 | Renewal of Fuses |
Subpart C | Inspections and Tests |
18.61 | Final Inspection of Complete Machine Inspection of Longwall Lighting Systems |
18.68 | Tests for Intrinsic Safety |
18.69 | Adequacy Tests |
PART 28 | FUSES FOR USE WITH DIRECT CURRENT IN PROVIDING SHORT-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES |
Subpart E | Construction, Performance, and Testing Requirements |
28.40 | Construction and Performance Requirements |
PART 36 | APPROVAL REQUIREMENTS FOR PERMISSIBLE MOBILE DIESEL-POWERED TRANSPORTATION EQUIPMENT |
PART 75 | MANDATORY SAFETY STANDARDS - UNDERGROUND COAL MINES |
Subpart R | Miscellaneous |
75.1719 | Illumination |
Related Program Policy Letters:
P11-V-12 | Revision of MSHA Program Policy Manual, Volume II, Section 18.45 - Insulation of Cable Reel and Spooling Devices |