ISSUE DATE: October 6, 2020

PROGRAM INFORMATION BULLETIN NO. P20-01

FROM:           SYED HAFEEZ

Director, Educational Policy and Development
and Program Evaluation and Information Resources
Mine Safety and Health Administration

SUBJECT:      Revalidation and Cancellation of MSHA Program Directives

Scope

This Program Information Bulletin (PIB) is for all MSHA program directives holders within MSHA, mine operators, independent contractors, miners' representatives, and other interested parties.

Purpose

The purpose of this PIB is to provide the results of the annual revalidation process and a list of policies and procedures that will be cancelled upon publication of this PIB.

Information

MSHA's revalidation process dictates that all directives must be reviewed annually or biennially to ensure the currency of their contents. This PIB provides the results of the Program Policy Letters' (PPLs'), Program Instruction Letters' (PILs'), and Program Information Bulletins' (PIBs') revalidation for Calendar Year 2020.

The attachment lists those PPLs, PILs, and PIBs that have been identified for cancellation during the review. They are no longer considered valid enforcement guidance and will be cancelled and removed from the MSHA website upon the issue of this bulletin.

Directives pages on the MSHA Internet continue to be the most up-to-date resource for in-force directives. All PPLs, PILs, and PIBs that remain posted on the MSHA website have an expiration date of March 31, 2021.


Background

Volume II, Chapter 100 of MSHA's Administrative Policy and Procedures Manual outlines MSHA Directives System and defines the purpose, responsibilities, structure, and procedures involved in the formulation, distribution, and maintenance of directives within the Agency. The Directives System also describes the procedures for assigning expiration dates to PPLs and PILs, as well as the procedures for periodical reviews and updates to directives.

Authority

The Federal Mine Safety and Health Act of 1977 [30 U.S.C. 801 et seq.] as amended by the Mine Improvement and New Emergency Response Act of 2006 ("MINER Act") [Pub. L. 109-236].

Issuing Office and Contact Person

Program Evaluation and Information Resources, Office of Program Policy and Evaluation
Izabela Zielinska (202) 693-9784 Zielinska.izabela.m@dol.gov

Distribution

All MSHA program directives holders. Attachment


ATTACHMENT

Results of PPLs, PILs and PIBs Review

PROGRAM POLICY LETTERS - CANCELLED

None

PROCEDURE INSTRUCTION LETTERS – CANCELLED

I14-V-01

Reissue of I12-V-04 & I12-IV-05 Revision of Accident Investigation
Procedures

9/25/2014

I12-III-01

Reissue of I09-III-01- MSHA Procedures for Assigning Legal Identity
Numbers and Relocation Notices at Auger and Highwall Mining Operations

3/8/2012

PROGRAM INFORMATION BULLETINS – CANCELLED

P15-01

Withdrawal of MSHA Approval for Pempek ABM20

3/26/2015

P14-06

Withdrawal of MSHA Approval for Sandvik ABM20

8/6/2014

P13-03

Operator Respirable Dust Sampling Requirements - Replaces PIB 09-31

4/1/2013

P11-51

De-energizing a Non-intrinsically Safe Automatic Fire Sensor and Warning Systems after a Main Mine Fan Stoppage

11/28/2011

P11-48

Reissue of PIB No. P07-21, Clarification of Requirements for Conveyor Belt System Start-Up Warnings on Conveyor Belt Systems which Start Automatically

6/30/2011

P11-46

Reissue of P07-18 - Maximum Total Exhaust System Backpressure Specification Increase for Caterpillar Inc.'s (Caterpillar's) 3304 PCNA and 3306 PCNA Diesel Engines

6/20/2011

P11-44

Reissue of P07-15 - Potential Safety Hazard on Permissible Mobile Diesel-Powered Transportation Equipment with Sandvik (formerly EJC Mining Equipment, Inc.) Wet Scrubber Systems

6/20/2011

P11-40

Reissue of P03-15 - Compliance with Diesel Particulate Matter Standard in Underground Coal Mines for Nonpermissible Heavy-Duty Diesel- Powered Equipment, Generators, and Compressors

5/16/2011

P11-39

Reissue of P09-38 - Information on Use of Biodiesel Fuel in Underground Diesel-Powered Equipment; Availability of Report

5/16/2011

P11-37

Reissue of P06-17 - Delayed Application of Spring-Applied Hydraulically- Released Brakes; Rubber-Tired Diesel and Electric-Powered Equipment

5/16/2011

P11-31

Reissue of P07-17 - Test Procedure for Evaluating Maximum Total Exhaust System Backpressure on an Underground Diesel-Powered Machine

4/28/2011


P11-26

Reissue of P02-07 - Compliance with Diesel Particulate Matter Standard in Underground Coal Mines - 04/13/2011

4/13/2011

P11-24

Re-Issue of P09-35 - Continuous Mining Machine Safety Features (Main Machine Circuit-Interrupting Device, Remote Traction Motor Circuit Breaker Reset, E-stop Override, Methane Monitor Failure Override)

4/13/2011

P11-21

Reissue of P07-14 - Fastenings Used for Joints of Flame-Arresting Paths on Intake or Exhaust Systems for Permissible Diesel-Powered Equipment

4/1/2011

P11-01

Redesign of the Emergency Stop Circuits on Model BHAC Joy Mining Machinery (formerly Stamler Corporation) Battery Coal Haulers

2/25/2011

P10-07

Re-Issue P01-06 - Diesel Particulate Matter in Underground Coal Mines
- Training Program Guide

7/8/2010

P10-05

Re-Issue P01-05 - Reporting "Sampling Start Time" on Redesigned Dust Data Card

6/16/2010

P09-21

Re-Issue P04-03 - Retrofit Program for Caterpillar Model 3306 PCNA Diesel Engines under Approval Numbers 7E-A002 and 7E-B003

7/31/2009

P09-04

AMS Operator Training Guide and Part 48 Task Training Addendum

3/3/2009

P08-07

Submission of Respirable Dust Samples using the MSHA Individual Identification Number (MIIN)

3/31/2008

P08-01

Change to Respirable Coal Mine Dust Enforcement Program

1/7/2008

P07-28

Updated Test Questions for Certifying Individuals to Perform Dust Sampling and Maintenance and Calibration of Approved Sampling Equipment (Amended)

12/28/2007