Most Frequently Cited Standards for 2006
Surface Coal
01/01/2006 - 12/31/2006 Statistics were compiled February 7, 2007 Total Violations for this type of operation: 8,667 |
---|
# of Viols. | Percent * | Standard and Title | Compliance Tips |
---|---|---|---|
1,408 | 16.25% |
77.404(a) Machinery and Equipment; Operation and Maintenance |
|
613 | 7.07% |
77.1605(d) Loading and Haulage Equipment; Installations |
Get Tip |
575 | 6.63% |
77.1104 Accumulations of Combustible Materials |
|
476 | 5.49% | 77.1606(c) Loading and Haulage Equipment; Inspection and Maintenance |
Get Tip |
409 | 4.72% | 77.1110 Examination and Maintenance of Firefighting Equipment |
Get Tip |
352 | 4.06% | 77.410(c) Mobile Equipment; Automatic Warning Devices |
Get Tip |
312 | 3.60% | 77.502 Electric Equipment; Examination, Testing, and Maintenance |
|
241 | 2.78% | 77.1605(b) Loading and Haulage Equipment; Installations |
Get Tip |
239 | 2.76% |
77.400(a) Mechanical Equipment Guards |
Get Tip |
219 | 2.53% |
77.410(a)(1) Mobile Equipment; Automatic Warning Devices |
Get Tip |
176 | 2.03% |
77.1109(c)(1) Quantity and Location of Firefighting Equipment |
|
173 | 2.00% |
77.1605(a) Loading and Haulage Equipment; Installations |
Get Tip |
144 | 1.66% |
77.1605(k) Loading and Haulage Equipment; Installations |
Get Tip |
140 | 1.62% |
72.620 Drill Dust Control at Surface Mines and Surface Areas of Underground Mines |
|
115 | 1.33% |
71.208(a) Bimonthly Sampling; Designated Work Positions |
|
112 | 1.29% |
77.1606(a) Loading and Haulage Equipment; Inspection and Maintenance |
Get Tip |
104 | 1.20% | 77.205(a) Travelways at Surface Installations |
Get Tip |
98 | 1.13% |
77.205(b) Travelways at Surface Installations |
Get Tip |
89 | 1.03% |
77.1000 Highwalls, Pits, and Spoil Banks; Plans |
|
73 | 0.84% | 77.202 Dust Accumulations in Surface Installations |